Compliance
Environmental permit
Securing your environmental permit protects your operations and removes a major source of regulatory risk.
What we do
- Permit application and renewal: completion of Formulaire 1/01, CAI update, sewerage network schematic.
- Discharge compliance: discharge point assessment, gap analysis against permit limits, coordination with treatment solutions.
- Stormwater management: compliance with the Code de l’Eau, infiltration, retention and valorisation, CoDT flood zone requirements.
- PFAS reporting: 28-substance discharge analysis, support for the permit renewal requirement, sector risk assessment.
Permit application and renewal
We handle the water component of your environmental permit file, from first application to renewal:
- Completion of the water section of the permit application form (Formulaire 1/01).
- Update of your industrial sanitation contract (Contrat d’Assainissement Industriel, CAI).
- Update of your sewerage network schematic, aligned with the situation on site.
A complete, consistent water file keeps your renewal on track and avoids delays caused by other consultants waiting on your section.
Discharge compliance
We review your discharge points against your permit conditions to flag risk before an inspection does:
- Assessment of discharge points and effluent characteristics.
- Gap analysis against your permit’s discharge limits.
- Coordination with a treatment solution where one is needed.
Knowing exactly where you stand against your permit limits is the first step to staying ahead of them.
Stormwater management
We design stormwater solutions that satisfy the hierarchy of the Walloon Code de l’Eau and your local permit conditions:
- Infiltration, retention and valorisation, assessed in that order.
- Site-specific design rather than a generic standard.
- Support for flood risk zone requirements under the CoDT.
Done well, stormwater management does more than satisfy your permit. It recharges groundwater and can reduce your reliance on mains water.
PFAS reporting
We help you prepare for a requirement that is becoming standard at permit renewal:
- Scoping and coordination of the 28-PFAS discharge analysis now required at renewal for suspected dischargers.
- Sector risk assessment: chemicals, metallurgy and waste treatment are the current priority sectors.
- Support in interpreting results ahead of future binding emission limits.
There is no binding PFAS emission limit in Wallonia yet, but the reporting requirement at renewal already applies. Acting now means preparing on your own timeline rather than reacting to one set by the regulator.
Project examples
- Organic wastewater treatment. Meeting environmental compliance by treating wastewater for solids, organic load, fats and grease.
- Integrated stormwater management. The design met all criteria for infiltration, retention, peak flow management and controlled discharge to the outfall.
Let’s review your permit file
Whether you are applying for a new environmental permit or facing a renewal deadline, getting the water component right keeps the rest of your file moving.
Let's talk about your water.
Tell us about your site: we will tell you where your levers are.